Feasibility Study Under Capacity Enhancement of Distribution Network in 13 Industrial Hub-Enriched PBSs Surrounding Dhaka City under BREB.

International Consultancy Support to carry out a Feasibility Study for a Waste to Energy Plant in Kampala, Uganda.

Renewal of Environmental Clearance Certificate (ECC) for 3D Seismic Survey over Zakiganj and Patharia West Structure Project

Preparation of Environmental and Social Impact Assessment (ESIA) including Environmental and Social Management Plan (ESMP) Construction Supervision Services of “Construction of New Dual Gauge Railway Siding Line from Ghorashal Railway Station to Polash Urea Fertilizer Factory” including Defect Liability Period

Traffic Survey (Overall Road), Socio-Economic Survey (Bridges), Environmental Survey, Lap Survey (Bridge Diversion Area), Video Data Collection, Bridge preliminary Survey/Reconnaissance Survey Under Consultancy Services for Feasibility Study, Hydromorphology study and conceptual Design for Replacement of Damaged/Narrow/Temporary Bridges and Culverts of Mymensingh Zone

Consultancy Services for Phase I Environmental Site Assessment Report & Soil Contamination Analysis for Construction of 6 Storied Factory Building at Checkpoint System Bangladesh Limited.

Feasibility Study, Detailed Design and Tendering Support of Technical Assistance for Sub Regional Road Transport Project Preparatory Facility-II under ADB Loan 3295-BAN: Additional Financing to the Sub regional Transport Project Preparatory Facility (SRTPPF-II).

Environmental Data Collection Surveys (Environmental Quality Assessment, Consultations and Modeling) under Main Contract “Feasibility Study for Construction of Bridges Over the River Meghna on Shariatpur-Chandpur Road & Gazaria-Munshiganj Road and Preparation of Masterplan for Bangladesh Bridge Authority:

Consultancy Services for Environmental Monitoring Services and Quality Test Assessment for Installation of Wellhead Gas Compressor at Titas (Location-C) and Narsingdi Gas Fields under Bangladesh Gas Field Company Limited (BGFCL). Under Contract No. BGFCL/JAICA/COMPRESSOR/EPC/BD/01 DATED March 19, 2019.